UNJUK KERJA PLTS DI BRANJANG RAWAPENING KABUPATEN SEMARANG

Djuniadi Djuniadi, Hari Wibawanto, Nur Iksan, Ahmad Fashiha Hastawan, Iqbal Fadlu Zaki, Wahyu Himawan

Abstract


The purpose of this study is to obtain the performance of a Solar Power Plant
installed at Rawapening Baranjang, Semarang, Central Java. Branjang is a
permanent place used by fishermen to catch fish. Engineering methods are used in this study. The results obtained are first, charging performance which starts at 06.45 - 15.00 produce changes in temperature and current. Secondly there signifcant rise in battery capacity, a steady performance of battery voltage and currents charging. Third, the discharging performance which starts at 17.00 - 06.00 shows a significant drop of battery capacity, with the discharging current and battery voltage remains constant.

Keywords: Performance, Solar Power Plant, Branjang, Rawapening